PLA filament for a steady print farm
Regular production demand with moderate expected print and support waste.
Input Summary
Annual usage
1,200 kg
Wastage rate
8%
Stock on hand
85 kg
Lead time
14 days
Safety stock
10 days
Target coverage
45 days
Cost per kg
$28
Calculation Breakdown
- 1Adjusted daily usage1,200 × 1.08 / 3653.55 kg/day
- 2Reorder point3.55 × (14 + 10)85.2 kg
- 3Target stock3.55 × (14 + 10 + 45)245.0 kg
- 4Suggested order245.0 − 85.0160.0 kg
Result Summary
Suggested order
160.0 kg
3D Printing Stock (Commercial) Calculator
Reorder at approximately 85.2 kg and purchase approximately 160.0 kg, worth about $4,480 at the entered cost.
Specialty resin with a longer lead time
Lower annual demand, a 30-day lead time, and a larger safety reserve for a production-critical material.
Input Summary
Annual usage
360 kg
Wastage rate
12%
Stock on hand
40 kg
Lead time
30 days
Safety stock
20 days
Target coverage
60 days
Cost per kg
$95
Calculation Breakdown
- 1Adjusted daily usage360 × 1.12 / 3651.10 kg/day
- 2Reorder point1.10 × (30 + 20)55.2 kg
- 3Target stock1.10 × (30 + 20 + 60)121.5 kg
- 4Suggested order121.5 − 40.081.5 kg
Result Summary
Suggested order
81.5 kg
3D Printing Stock (Commercial) Calculator
Reorder at about 55.2 kg. With 40 kg available, the planning order is about 81.5 kg, valued at about $7,742.47.
Nylon stock with ample inventory
A commonly available material with short lead time and stock already above the calculated target.
Input Summary
Annual usage
600 kg
Wastage rate
5%
Stock on hand
120 kg
Lead time
7 days
Safety stock
7 days
Target coverage
30 days
Cost per kg
$42
Calculation Breakdown
- 1Adjusted daily usage600 × 1.05 / 3651.73 kg/day
- 2Reorder point1.73 × (7 + 7)24.2 kg
- 3Target stock1.73 × (7 + 7 + 30)75.9 kg
- 4Suggested ordermax(0, 75.9 − 120.0)0 kg
Result Summary
Suggested order
0 kg
3D Printing Stock (Commercial) Calculator
The reorder point is about 24.2 kg, while the current 120 kg is estimated to cover about 69.5 days. No order is suggested.
Metal powder for a scheduled production period
Higher material value, material losses, and a target designed to cover a longer planned operating period.
Input Summary
Annual usage
2,400 kg
Wastage rate
15%
Stock on hand
180 kg
Lead time
21 days
Safety stock
14 days
Target coverage
50 days
Cost per kg
$68
Calculation Breakdown
- 1Adjusted daily usage2,400 × 1.15 / 3657.56 kg/day
- 2Reorder point7.56 × (21 + 14)264.7 kg
- 3Target stock7.56 × (21 + 14 + 50)642.7 kg
- 4Suggested order642.7 − 180.0462.7 kg
Result Summary
Suggested order
462.7 kg
3D Printing Stock (Commercial) Calculator
The reorder point is about 264.7 kg. Current stock is below that level, and the estimated order is about 462.7 kg, valued at about $31,463.01.
How to Read Your Results
The reorder point is a trigger level, not the quantity to buy.
Current stock coverage shows approximate days of average adjusted usage remaining.
Safety stock is a reserve quantity included within the reorder point and target stock level.
The suggested order quantity restores inventory to the target level based on stock on hand.
Round the calculated quantity to practical supplier pack sizes after checking material compatibility and storage requirements.
Assumptions & Important Notes
- Each example uses one material SKU with usage spread evenly through the year.
- Stock on hand is usable and not already allocated to open production jobs.
- Daily demand includes the entered wastage allowance.
- Costs are illustrative and exclude any amounts not included in the stated per-kilogram cost.
Related Examples
Frequently Asked Questions
Should a print farm use one stock calculation for all filament?
Usually no. Run separate calculations when materials differ by type, color, diameter, supplier approval, cost, lead time, or demand pattern.
What does a high reorder point indicate?
It commonly reflects high daily usage, a long supplier lead time, a larger safety reserve, or a combination of these factors.
Can I use the examples for resin, filament, and powder?
Yes, the inventory logic is the same, but each material's wastage, storage conditions, pack size, and usable shelf life may differ.
How should I handle supplier pack sizes?
Use the result as a planning quantity, then round to available packs and reassess the resulting inventory level.
Ready to calculate your own result?
Use the live calculator with your own inputs, timing, and preferences.